Part 3 · Using the app
The claim package for your accountant
Turns your people, hours and costs into the spending tables and the T661 project description, then two PDFs: a filing copy for your preparer and a review binder with the evidence, kept for a CRA review. The credit estimate stays on screen.
Open it
- Right-click a project on the board and pick Claim package, or
- open the project panel and go to the Claim tab for a quick look, then Open claim package.
Pick the dates
Fiscal year sets the dates to your last finished fiscal year, from the year end in Account, SR&ED profile. You can also pick any From and To dates. Salaries are prorated to the dates you pick.
What goes in
| Section | Where it comes from |
|---|---|
| Salaries | Automatic. Pay x time on R&D from Account, People, then split across a person's projects by their GitHub research hours. You can change the share. |
| Contractors | People marked contractor are filled in. Add others by hand. 80% of arm's length payments for work in Canada counts. |
| Materials and equipment | Optional. Most software projects leave this empty. Manufacturing and food projects often have materials used up in trials: type them in, or connect an app that adds them (each row then says From the app, how the material counts and the trials it was used in). |
| Overhead | Proxy method (55% of salaries, no receipts) or actual costs. One choice for the whole company. |
| Grants and funding | Amounts like IRAP, or a customer or partner paying for the work. These lower the claim. With none, the PDF says so in plain words. |
Hours come from Past assessments
Salaries are split by the hours in the Past assessments that fall inside your dates. Link each person to their GitHub author in Account, People so their hours are found.
The project description (T661)
Project description is the first section: one T661 Part 2 description for the project, written from its Past assessments in the dates. Click Write project description, then read and edit it. The checklist shows it until it is written. See The T661 project description in this guide.
Recorded time, notes, links and trials
Under the costs, Recorded time and evidence keeps proof that was written down as the work happened. Record time logs hours for one person on one day. Add note and Add link keep explanations, test results and documents with the claim.
- Recorded time replaces the estimate for that person on that day. It is never added on top. Each entry shows the estimate it replaced, for example "estimate was 6 h".
- You can only record time for people on the project: ticked on its Team, or linked to a GitHub author with commits in its repos.
- Every item shows where it came from: Added by a person, or the name of an outside app.
- Time from an outside app can say how it was captured and who approved it, for example "Recorded with a timer · Approved by Priya", or "Entered later · Approved by Dana (Admin) for Priya: on leave" when an Admin approved it for someone. The claim PDF prints the same line.
- Remove asks for a reason. The item stops counting but is kept, with who removed it and why. Turn on Show removed to see them, and Restore to count one again.
- Trials come from outside apps (for example a trial log on the shop floor or in the kitchen): one experiment, batch or test run, numbered TRIAL-1, TRIAL-2, ... with what was expected, what was changed, the setup, the result, what was learned and who ran it. A trial never adds hours.
- Files an app kept with an item (photos, CSVs, PDFs) are listed under it: click one to download it. The claim PDF lists their names.
Daily limit
Recorded time for one person can't go over the company's maximum hours per day (Account, SR&ED profile), counted across every project.
Lock a filed period
Once a period is filed, an Admin sets Hours locked through to its last day (Account, SR&ED profile, Claim history). Outside apps and API keys then can't add, change or remove time on or before that day. Clear it to unlock.
The credit estimate
- CCPCs earn 35% on the first $6M a year, paid out as cash for current spending. Above that, 15%.
- The $6M limit shrinks when last year's taxable capital is between $15M and $75M.
- The limit is for the whole company, so the estimate adds up all projects in the same dates.
- Other corporations earn 15%, which lowers tax owing.
It is an estimate
Specified employees, associated companies and provincial credits need your accountant. The app flags them instead of guessing. The estimate is for you: it is not in the PDF.
Download the PDFs
The CRA gets your claim as form data: the preparer keys the T661 into the tax return and files it electronically. The evidence is not sent with it. You keep it, and hand it over only if the CRA asks for a review. So there are two downloads:
| What is in it | Who it is for | |
|---|---|---|
| Download filing copy | Company details and qualified spending, the project summary page, the T661 Part 2 description, salaries, contractors, other costs and hours per person, and how the amounts were worked out. | Your preparer. They file from it. |
| Download review binder | Everything in the filing copy, plus recorded time, notes, links and trials, and the evidence for each repo and piece of work (hours, activity sessions, supporting evidence, Jira tickets). | You. Keep it in case the CRA asks for a review. |
The binder says which claim it goes with
Once Filed on is set under Filed and assessed, the binder's first page reads "Matches the T661 filed on" that date. If the description was changed after that day, it says so instead.
Both carry facts only. The credit estimate, the app's notes and verdicts, missing-field flags, word counts, removed items, reasons and the checklist stay on the Claim screen. Fields you have not filled in are left off rather than printed as missing.
Turn on List every commit to add each commit (date, author, message) to the review binder. The filing copy never lists them. The drawer's Claim tab downloads the filing copy.
Filed and assessed
At the bottom of the claim package, Filed and assessed keeps what happened after the filing copy went to your accountant. It is kept per fiscal year (pick Fiscal year at the top) and is the same on every project's claim for that year, because they all go on one tax return.
- Filed on and Prepared and filed by: the filing date can't be before the year ended or in the future.
- Lock hours through the year's last day: the same switch as Hours locked through in the SR&ED profile. Apps and API keys then can't add, change or remove time in the filed year.
- Add the notice of assessment: its date, the result (allowed as filed, allowed with changes, under review, not allowed), the credit allowed and a note. The app shows how it compares with its own estimate.
- Keep the notice itself: a PDF, PNG or JPEG, up to 4 MB, five files at most. Remove asks for a reason and keeps the file listed, struck through.
The status at the top of the box reads Not filed yet, Filed with the date, or Assessed with the date and the result.
Sources
This guide helps you prepare. It is not tax advice. Have your SR&ED preparer review your claim before you file.